Tulsita Solar (ERCOT-21INR0223) — Project Summary

Queue ID
ERCOT-21INR0223
Capacity
256.2 MW
Technology
Solar
Status
active
Location
Goliad, TX
Region
ERCOT
Developer
Ray Ranch Solar LLC
IA Status
IA Executed

Tulsita Solar

ERCOT-21INR0223BetaActiveSolarERCOTLBNL + Live

256.2 MW generation in Goliad, TX · In queue since December 2018 · Proposed COD May 2026

256.2 MW

Capacity

1

Components

Solar

7y 5m

In Queue

IA Executed

IA Status

Signed Sep 2022

Interconnection

Queue → IA

3y 9m

IA → COD

3y 8m

Total Duration

3y 9m

Construction75%
Queue EntryDec 5, 2018

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 19, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-05-30

About

Tulsita Solar is a proposed 256.2 MW solar generation project located in Goliad County, Texas. The developer is Ray Ranch Solar LLC. This project is listed in the ERCOT interconnection queue as entry ERCOT-21INR0223, with an original queue entry date of December 5, 2018. The proposed commercial operation date is May 30, 2026.

The project's interconnection agreement (IA) was executed on September 19, 2022. The point of interconnection (POI) is Tap 138kV 8590 Tuleta - 8595 Euler.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Goliad

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Ray Ranch Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 8590 Tuleta - 8595 Euler

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Tuleta Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.