Greyhound Solar (ERCOT-21INR0268) — Project Summary

Queue ID
ERCOT-21INR0268
Capacity
587.76 MW
Technology
Solar
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Rockhound Solar 2, LLC dba "Greyhound Solar"
IA Status
IA Executed

Greyhound Solar

ERCOT-21INR0268BetaActiveSolarERCOTLBNL + Live

587.76 MW generation in Ector, TX · In queue since March 2019 · Proposed COD March 2026

587.76 MW

Capacity

1

Components

Solar

7y 2m

In Queue

IA Executed

IA Status

Signed Jan 2022

Interconnection

Queue → IA

2y 10m

IA → COD

4y 2m

Total Duration

2y 10m

Schedule

1 months past proposed COD

Construction75%
Queue EntryMar 28, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 15, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-03-31

About

Greyhound Solar is a proposed solar generation project with a total capacity of 587.76 MW. The project, located in Ector County, Texas, is being developed by Rockhound Solar 2, LLC dba "Greyhound Solar". It consists of 587.76 MW of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-21INR0268, with an original queue entry date of March 28, 2019. The proposed commercial operation date is March 31, 2026. The project's Interconnection Agreement (IA) has been executed as of January 15, 2022. The point of interconnection is Tap 345kV 11010 Wolf - 1018 Moss.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Rockhound Solar 2, LLC dba "Greyhound Solar"

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 11010 Wolf - 1018 Moss

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WHCCS2_CC2
POI Substation
Wolf Hollow Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.