Halo Solar (ERCOT-21INR0304) — Project Summary

Queue ID
ERCOT-21INR0304
Capacity
254 MW
Technology
Solar
Status
suspended
Location
Bell, TX
Region
ERCOT
Developer
Ben Milam Solar 3
IA Status
IA Executed

Halo Solar

ERCOT-21INR0304BetaSuspendedSolarERCOTLBNL

254 MW generation in Bell, TX · In queue since January 2020

254 MW

Capacity

1

Components

Solar

6y 4m

In Queue

IA Executed

IA Status

Signed Aug 2022

Interconnection

Queue → IA

2y 7m

Total Duration

2y 7m

Suspended75%
Queue EntryJan 22, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 18, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 12–24 months

Commercial Operation

Commercial operation date not yet determined

About

Halo Solar is a proposed solar generation project with a total capacity of 254 MW, located in Bell County, Texas. The project is being developed by Ben Milam Solar 3. It is listed in the ERCOT interconnection queue as entry ERCOT-21INR0304, with a queue entry date of January 22, 2020. The project's interconnection agreement was executed on August 18, 2022, and its current status is suspended.

The point of interconnection is at the tap 345kV 3687 Bell E - 39950 TNTNP One, one-fourth from Bell.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Ben Milam Solar 3

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 345kV 3687 Bell E - 39950 TNTNP One, one-fourth from Bell

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Bell County Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.