Space City Solar (ERCOT-21INR0341) — Project Summary

Queue ID
ERCOT-21INR0341
Capacity
609.74 MW
Technology
Solar
Status
active
Location
Wharton, TX
Region
ERCOT
Developer
Apollo Solar Ranch, LLC
IA Status
IA Executed

Space City Solar

ERCOT-21INR0341BetaActiveSolarERCOTLBNL + Live

609.74 MW generation in Wharton, TX · In queue since November 2019 · Proposed COD June 2027

609.74 MW

Capacity

1

Components

Solar

6y 6m

In Queue

IA Executed

IA Status

Signed Jan 2021

Interconnection

Queue → IA

1y 2m

IA → COD

6y 5m

Total Duration

1y 2m

Construction75%
Queue EntryNov 1, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 6, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-06-01

About

Space City Solar is a proposed 609.74 MW solar generation project located in Wharton County, Texas. Developed by Apollo Solar Ranch, LLC, the project consists entirely of solar photovoltaic generation. It is currently active in the ERCOT interconnection queue as entry ERCOT-21INR0341, with a queue entry date of November 1, 2019. The project's proposed commercial operation date is June 1, 2027, and its Interconnection Agreement (IA) was executed on January 6, 2021.

The point of interconnection for Space City Solar is the 44200 Hillje 345kV substation. The project has been the subject of recent news coverage, with 13 articles categorized as pertaining to industry and regulatory matters.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Wharton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Apollo Solar Ranch, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

44200 Hillje 345kV

Data Source

LBNL + Live

RulingoppositionBelleville News-Democrat · 2025-06-02
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Hillje Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.