Orange Grove Solar
130.6 MW generation in Jim Wells, TX · In queue since July 2019 · Proposed COD April 2025
130.6 MW
Capacity
1
Components
Solar
6y 10m
In Queue
IA Executed
IA Status
Signed Jun 2022
Queue → IA
2y 11m
IA → COD
2y 10m
Total Duration
2y 11m
Schedule
12 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2025-04-30
Orange Grove Solar is a proposed 130.6 MW solar generation project located in Jim Wells County, Texas. The developer is Enbridge Solar (Orange Grove), LLC. The project is interconnected within the ERCOT region under queue ID ERCOT-21INR0393, with an interconnection queue entry date of July 12, 2019. The proposed commercial operation date is April 30, 2025.
The project's Interconnection Agreement (IA) has been executed as of June 8, 2022. Orange Grove Solar is linked to the existing operating Orange Grove plant (EIA plant ID 65891). The project has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Jim Wells
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Enbridge Solar (Orange Grove), LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
5660 Orange Grove 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- OGS_SLR_RN
- POI Substation
- Orange Grove Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14
View all articlesNo ask pi reports yet for this entity.
ask pi about Orange Grove Solar