McClure Solar
105.73 MW generation in Palo Pinto, TX · In queue since June 2020 · Proposed COD December 2025
105.73 MW
Capacity
1
Components
Solar
5y 11m
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
5y 6m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
The McClure Solar project is a proposed 105.73 MW solar generation facility in Palo Pinto County, Texas. The project, developed by McClure Solar LLC, is interconnected within the ERCOT region under queue ID ERCOT-21INR0509. It entered the interconnection queue on June 3, 2020, and has a proposed commercial operation date of December 31, 2025. Its interconnection status is currently in the Facility Study phase.
The proposed project consists of 105.73 MW of solar capacity. The point of interconnection is at the tap 69kV 785 Oran - 343 Morris Sheppard. The McClure Solar project has been mentioned in recent news coverage related to the energy industry.
Generated from interconnection queue and public data sources
State
TX
County
Palo Pinto
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
McClure Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 69kV 785 Oran - 343 Morris Sheppard
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26