Hays Energy Unit 3 Repower
18 MW generation in Hays, TX · In queue since October 2020 · Proposed COD December 2026
18 MW
Capacity
1
Components
Gas
5y 7m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-03
The Hays Energy Unit 3 Repower is a proposed 18 MW gas-fired generation project located in Hays County, Texas. Developed by HAYS ENERGY, LLC, the project is listed in the ERCOT interconnection queue as entry ERCOT-21INR0527, with a queue entry date of October 7, 2020. The proposed commercial operation date is December 3, 2026.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 7043 Hays 345kV substation.
Generated from interconnection queue and public data sources
State
TX
County
Hays
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
HAYS ENERGY, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
7043 Hays 345kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HAYSEN1_2
- POI Substation
- Hays Energy Station