Brazos Wind Repower
22.4 MW generation in Scurry, TX · In queue since December 2020 · Proposed COD November 2025
22.4 MW
Capacity
1
Components
Wind
5y 5m
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
4y 11m
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-11-14
The Brazos Wind Repower is a proposed wind generation project located in Scurry County, Texas, with a total capacity of 22.4 MW. Developed by Brazos Wind Ventures, LLC, the project consists of 22.4 MW of wind power. It is listed in the ERCOT interconnection queue as entry ERCOT-21INR0532, with a queue entry date of December 22, 2020, and a proposed commercial operation date of November 14, 2025. The project's interconnection status is currently in the Facility Study phase.
The proposed project would interconnect at the 1064 Sun 138kV point of interconnection. The Brazos Wind Repower has appeared in recent news coverage regarding renewable energy projects in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Scurry
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRAZOS WIND VENTURES, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
1064 Sun 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Sun Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.