Brazos Wind Repower (ERCOT-21INR0532) — Project Summary

Queue ID
ERCOT-21INR0532
Capacity
22.4 MW
Technology
Wind
Status
active
Location
Scurry, TX
Region
ERCOT
Developer
BRAZOS WIND VENTURES, LLC
IA Status
Facility Study

Brazos Wind Repower

ERCOT-21INR0532BetaActiveWindERCOTLBNL + Live

22.4 MW generation in Scurry, TX · In queue since December 2020 · Proposed COD November 2025

22.4 MW

Capacity

1

Components

Wind

5y 5m

In Queue

Facility Study

IA Status

COD target: 2025

Interconnection

Total Duration

4y 11m

Schedule

6 months past proposed COD

Facilities Study50%
Queue EntryDec 22, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-11-14

About

The Brazos Wind Repower is a proposed wind generation project located in Scurry County, Texas, with a total capacity of 22.4 MW. Developed by Brazos Wind Ventures, LLC, the project consists of 22.4 MW of wind power. It is listed in the ERCOT interconnection queue as entry ERCOT-21INR0532, with a queue entry date of December 22, 2020, and a proposed commercial operation date of November 14, 2025. The project's interconnection status is currently in the Facility Study phase.

The proposed project would interconnect at the 1064 Sun 138kV point of interconnection. The Brazos Wind Repower has appeared in recent news coverage regarding renewable energy projects in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Scurry

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRAZOS WIND VENTURES, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1064 Sun 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Sun Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Brazos Wind Repower