Dragan Solar (ERCOT-22INR0237) — Project Summary

Queue ID
ERCOT-22INR0237
Capacity
411 MW
Technology
Solar
Status
active
Location
Comanche, TX
Region
ERCOT
Developer
Hecate Comanche Solar LLC
IA Status
Facility Study

Dragan Solar

ERCOT-22INR0237BetaActiveSolarERCOTLBNL + Live

411 MW generation in Comanche, TX · In queue since November 2019 · Proposed COD September 2027

411 MW

Capacity

1

Components

Solar

6y 6m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

7y 10m

Facilities Study50%
Queue EntryNov 11, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-15

About

The Dragan Solar project is a proposed 411 MW solar generation facility in Comanche County, Texas. The project, being developed by Hecate Comanche Solar LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-22INR0237, with a queue entry date of November 11, 2019. The project's proposed commercial operation date is September 15, 2027, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 411 MW of solar photovoltaic generation. It is planned to connect to the grid at the 1440 Comanche 345kV point of interconnection. The Dragan Solar project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Comanche

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Comanche Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1440 Comanche 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CPSES_UNIT1
POI Substation
Comanche Peak Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.