Rockefeller Solar
207.48 MW generation in Schleicher, TX · In queue since October 2019
207.48 MW
Capacity
1
Components
Solar
6y 7m
In Queue
—
IA Status
Total Duration
6y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
The Rockefeller Solar project is a proposed 207.48 MW solar generation project located in Schleicher County, Texas. The project is listed in the ERCOT interconnection queue as entry ERCOT-22INR0238, with a queue entry date of October 31, 2019. The project's status is currently listed as suspended.
The Rockefeller Solar project has been featured in recent industry news.
Generated from interconnection queue and public data sources
State
TX
County
Schleicher
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
—
Utility
—
Entity
ERCOT
Service Type
—
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Rockefeller Solar