Desert Vine Solar (ERCOT-22INR0307) — Project Summary

Queue ID
ERCOT-22INR0307
Capacity
121.29 MW
Technology
Solar
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
Desert Vine Solar LLC
IA Status
IA Executed

Desert Vine Solar

ERCOT-22INR0307BetaActiveSolarERCOTLBNL

121.29 MW generation in Zapata, TX · In queue since May 2020 · Proposed COD December 2026

121.29 MW

Capacity

1

Components

Solar

6 years

In Queue

IA Executed

IA Status

Signed Dec 2022

Interconnection

Queue → IA

2y 7m

IA → COD

4 years

Total Duration

2y 7m

Construction75%
Queue EntryMay 1, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 16, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-12-30

About

Desert Vine Solar is a proposed solar generation project with a total capacity of 121.29 MW, located in Zapata County, Texas. The developer is Desert Vine Solar LLC. The project is in the ERCOT interconnection queue as entry ERCOT-22INR0307, with a queue entry date of May 1, 2020, and a proposed commercial operation date of December 30, 2026. The Interconnection Agreement (IA) has been executed as of December 16, 2022.

The proposed project is linked to the existing Desert Vine Solar operating plant (EIA plant ID 66493). The point of interconnection (POI) is Tap 138kV 8957 Lopeno - 8299 Zapata at the TSP's Snapdragon Station. The Desert Vine Solar project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Desert Vine Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 8957 Lopeno - 8299 Zapata Will be TSP_x0019_s Snapdragon Station

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
BRP_ZPT1_RN
POI Substation
Zapata Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.