Estonian Solar (ERCOT-22INR0335) — Project Summary

Queue ID
ERCOT-22INR0335
Capacity
202.5 MW
Technology
Solar
Status
active
Location
Delta, TX
Region
ERCOT
Developer
Enel Green Power Estonian Solar Project, LLC
IA Status
IA Executed

Estonian Solar

ERCOT-22INR0335BetaActiveSolarERCOTLBNL

202.5 MW generation in Delta, TX · In queue since April 2020 · Proposed COD January 2025

202.5 MW

Capacity

1

Components

Solar

6y 1m

In Queue

IA Executed

IA Status

Signed Aug 2021

Status
Latest milestonecommercial operationsESS News · 2025-02-07
Interconnection

Queue → IA

1y 4m

IA → COD

3y 5m

Total Duration

1y 4m

Schedule

15 months past proposed COD

Construction75%
Queue EntryApr 22, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 12, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2025-01-31

About

The Estonian Solar project is a proposed 202.5 MW solar generation facility in Delta County, Texas. The project, developed by Enel Green Power Estonian Solar Project, LLC, is interconnected within the ERCOT region under queue ID ERCOT-22INR0335. It entered the interconnection queue on April 22, 2020, and has a proposed commercial operation date of January 31, 2025.

The project's Interconnection Agreement (IA) was executed on August 12, 2021. The Estonian Solar project is linked to the existing Estonian Solar Project, LLC operating plant (EIA plant ID 66872). Recent news coverage has discussed the development of this project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Delta

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Enel Green Power Estonian Solar Project, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 138kV 17011 Enloe POI _x0013_ 1816 Commerce Switch

Data Source

LBNL

DeveloperEnel North AmericaESS News · 2025-02-07
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
HIGH
Nearest Node (Estimated)
ESTONIAN_ALL

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.