Sandow Solar (ERCOT-22INR0350) — Project Summary

Queue ID
ERCOT-22INR0350
Capacity
287.18 MW
Technology
Solar
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Sandow Lakes Ranch Solar I, LLC
IA Status
Facility Study

Sandow Solar

ERCOT-22INR0350BetaActiveSolarERCOTLBNL + Live

287.18 MW generation in Milam, TX · In queue since September 2020 · Proposed COD June 2028

287.18 MW

Capacity

1

Components

Solar

5y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Status
Latest milestoneconstruction commenced · Q3 2024JLL · 2025-01-15
Expected CODQ3 2026JLL · 2025-01-15
Interconnection

Total Duration

7y 9m

Facilities Study50%
Queue EntrySep 11, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

About

Sandow Solar is a proposed 287.18 MW solar generation project located in Milam County, Texas. The developer is Sandow Lakes Ranch Solar I, LLC. The project is in the ERCOT interconnection queue as entry ERCOT-22INR0350, with a queue entry date of September 11, 2020, and a proposed commercial operation date of June 1, 2028. Its interconnection agreement status is currently Facility Study. The point of interconnection is tap one 345kV 7040 Austrop - 13429 Sandow line.

The project is linked to the existing Walleye Solar (Sandow II) operating plant (EIA ID 68231). Sandow Solar has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sandow Lakes Ranch Solar I, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap one 345kV 7040 Austrop - 13429 Sandow line

Data Source

LBNL + Live

DeveloperSandow Lakes Energy±Austin American-Statesman · 2025-04-10
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (2)Beta

Last updated 2026-04-09

View all articles

No ask pi reports yet for this entity.

ask pi about Sandow Solar