Harper Energy Storage (ERCOT-22INR0469) — Project Summary

Queue ID
ERCOT-22INR0469
Capacity
82.42 MW
Technology
Battery
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
VESI 31 LLC
IA Status
Facility Study

Harper Energy Storage

ERCOT-22INR0469BetaActiveBatteryERCOTLBNL + Live

82.42 MW storage in Cameron, TX · In queue since December 2021 · Proposed COD September 2028

82.42 MW

Capacity

1

Components

Battery

4y 5m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

6y 9m

Facilities Study50%
Queue EntryDec 3, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-15

About

The Harper Energy Storage project is a proposed 82.42 MW battery energy storage system in Cameron County, Texas. The project, developed by VESI 31 LLC, is located within the ERCOT region and consists entirely of battery storage. It is listed in the ERCOT interconnection queue as entry ERCOT-22INR0469, with a queue entry date of December 3, 2021, and a proposed commercial operation date of September 15, 2028. The project's interconnection status is currently in the Facility Study phase.

Recent news coverage indicates activity related to the project, specifically in the area of deals.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

VESI 31 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 8314 La Palma - 80229 Villa Cavazos

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
La Palma 138 kV Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Harper Energy Storage