TAIN SOLAR
37.54 MW generation in Caldwell, TX · In queue since December 2020 · Proposed COD October 2027
37.54 MW
Capacity
1
Components
Solar
5y 5m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
6y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-27
TAIN SOLAR is a proposed 37.54 MW solar generation project located in Caldwell County, Texas. The project, being developed by Abei Energy Green VII LLC, is interconnected within the ERCOT region under queue ID ERCOT-22INR0473. It entered the interconnection queue on December 3, 2020, and has a proposed commercial operation date of October 27, 2027. The project's interconnection status is currently in the Facility Study phase.
TAIN SOLAR has been the subject of recent news coverage, with 16 articles related to the project appearing in industry publications.
Generated from interconnection queue and public data sources
State
TX
County
Caldwell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Abei Energy Green VII LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 138kV 7216 Lockhart - 7224 Luling City
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Lockhart Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about TAIN SOLAR