Aquilla Lake 3 Wind (ERCOT-22INR0499) — Project Summary

Queue ID
ERCOT-22INR0499
Capacity
304.6 MW
Technology
Wind
Status
active
Location
Hill, TX
Region
ERCOT
Developer
Aquilla Lake 3 Wind
IA Status
IA Executed

Aquilla Lake 3 Wind

ERCOT-22INR0499BetaActiveWindERCOTLBNL + Live

304.6 MW generation in Hill, TX · In queue since March 2021 · Proposed COD March 2027

304.6 MW

Capacity

1

Components

Wind

5y 2m

In Queue

IA Executed

IA Status

Signed Jan 2024

Interconnection

Queue → IA

2y 10m

IA → COD

3y 2m

Total Duration

2y 10m

Construction75%
Queue EntryMar 8, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 24, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2027-03-01

About

The Aquilla Lake 3 Wind project is a proposed wind generation facility with a total capacity of 304.6 MW. The project, located in Hill County, Texas, is being developed by Aquilla Lake 3 Wind. It is currently in the ERCOT interconnection queue as entry ERCOT-22INR0499, with a queue entry date of March 8, 2021.

The project's proposed commercial operation date is March 1, 2027. An Interconnection Agreement (IA) for the project was executed on January 24, 2024. The point of interconnection (POI) is at the tap 345 kV 68040 Kopperl to 68091 Navarro. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hill

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Aquilla Lake 3 Wind

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 345 kV 68040 Kopperl to 68091 Navarro

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.