Shamrock Wind SLF (ERCOT-22INR0502) — Project Summary

Queue ID
ERCOT-22INR0502
Capacity
223.92 MW
Technology
Wind
Status
active
Location
Crockett, TX
Region
ERCOT
Developer
Shamrock Interconnection LLC
IA Status
IA Executed

Shamrock Wind SLF

ERCOT-22INR0502BetaActiveWindERCOTLBNL

223.92 MW generation in Crockett, TX · In queue since March 2021 · Proposed COD February 2025

223.92 MW

Capacity

1

Components

Wind

5y 2m

In Queue

IA Executed

IA Status

Signed May 2022

Interconnection

Queue → IA

1y 2m

IA → COD

2y 9m

Total Duration

1y 2m

Schedule

14 months past proposed COD

Construction75%
Queue EntryMar 1, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMay 13, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2025-02-28

About

The Shamrock Wind SLF project is a proposed 223.92 MW wind generation project located in Crockett County, Texas. The developer is Shamrock Interconnection LLC. This project is listed in the ERCOT interconnection queue as entry ERCOT-22INR0502, with a queue entry date of March 1, 2021, and a proposed commercial operation date of February 28, 2025. An Interconnection Agreement (IA) has been executed as of May 13, 2022.

The project is linked to the existing Shamrock Wind operating plant (EIA ID 66540). The point of interconnection is the Tap 345 kV 7053 Noelke - 76005 Schneeman. The Shamrock Wind SLF project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Crockett

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Shamrock Interconnection LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345 kV 7053 Noelke - 76005 Schneeman

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
HIGH
Nearest Node (Estimated)
SHAMROCK_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.