Harley Hand Solar
513.7 MW generation in Nolan, TX · In queue since December 2019 · Proposed COD April 2029
513.7 MW
Capacity
1
Components
Solar
6y 5m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
9y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-04-07
The Harley Hand Solar project is a proposed 513.7 MW solar generation facility in Nolan County, Texas. The project, developed by HECTATE ENERGY HARLEY HAND SOLAR LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0008, with a queue entry date of December 16, 2019, and a proposed commercial operation date of April 7, 2029. Its interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Hecate Energy Harley Hand Solar LLC operating plant (EIA ID 64234) with a match confidence of 84%.
Generated from interconnection queue and public data sources
State
TX
County
Nolan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
HECTATE ENERGY HARLEY HAND SOLAR LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
11420 Sweetwater East 345kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- TRENT_TRENT
- POI Substation
- Sweetwater East Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.