Harley Hand Solar (ERCOT-23INR0008) — Project Summary

Queue ID
ERCOT-23INR0008
Capacity
513.7 MW
Technology
Solar
Status
active
Location
Nolan, TX
Region
ERCOT
Developer
HECTATE ENERGY HARLEY HAND SOLAR LLC
IA Status
Facility Study

Harley Hand Solar

ERCOT-23INR0008BetaActiveSolarERCOTLBNL + Live

513.7 MW generation in Nolan, TX · In queue since December 2019 · Proposed COD April 2029

513.7 MW

Capacity

1

Components

Solar

6y 5m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

9y 4m

Facilities Study50%
Queue EntryDec 16, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-07

About

The Harley Hand Solar project is a proposed 513.7 MW solar generation facility in Nolan County, Texas. The project, developed by HECTATE ENERGY HARLEY HAND SOLAR LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0008, with a queue entry date of December 16, 2019, and a proposed commercial operation date of April 7, 2029. Its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Hecate Energy Harley Hand Solar LLC operating plant (EIA ID 64234) with a match confidence of 84%.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Nolan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

HECTATE ENERGY HARLEY HAND SOLAR LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

11420 Sweetwater East 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
TRENT_TRENT
POI Substation
Sweetwater East Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.