Langer Solar (ERCOT-23INR0030) — Project Summary

Queue ID
ERCOT-23INR0030
Capacity
249.8 MW
Technology
Solar
Status
active
Location
Bosque, TX
Region
ERCOT
Developer
Langer Solar LLC
IA Status
IA Executed

Langer Solar

ERCOT-23INR0030BetaActiveSolarERCOTLBNL

249.8 MW generation in Bosque, TX · In queue since June 2020 · Proposed COD March 2027

249.8 MW

Capacity

1

Components

Solar

5y 11m

In Queue

IA Executed

IA Status

Signed Aug 2023

Interconnection

Queue → IA

3y 2m

IA → COD

3y 7m

Total Duration

3y 2m

Construction75%
Queue EntryJun 3, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementAug 31, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-03-01

About

Langer Solar is a proposed solar generation project with a total capacity of 249.8 MW, located in Bosque County, Texas. The developer is Langer Solar LLC. This project is in the ERCOT interconnection queue as entry ERCOT-23INR0030, with a queue entry date of June 3, 2020, and a proposed commercial operation date of March 1, 2027. The interconnection agreement has been executed as of August 31, 2023.

The proposed project is linked to the existing Langer operating plant (EIA ID 67659). Recent news coverage has discussed this project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bosque

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Langer Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 345kV 68040 Kopperl - 68091 Navarro

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW
POI Substation
Powell Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Langer Solar