Tanglewood Solar (ERCOT-23INR0054) — Project Summary

Queue ID
ERCOT-23INR0054
Capacity
250.96 MW
Technology
Solar
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Brazoria Solar, LLC
IA Status
IA Executed

Tanglewood Solar

ERCOT-23INR0054BetaActiveSolarERCOTLBNL + Live

250.96 MW generation in Brazoria, TX · In queue since July 2020 · Proposed COD March 2026

250.96 MW

Capacity

1

Components

Solar

5y 10m

In Queue

IA Executed

IA Status

Signed Nov 2022

Interconnection

Queue → IA

2y 4m

IA → COD

3y 4m

Total Duration

2y 4m

Schedule

2 months past proposed COD

Construction75%
Queue EntryJul 10, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementNov 1, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-03-15

About

Tanglewood Solar is a proposed 250.96 MW solar generation project located in Brazoria County, Texas. The project, developed by Brazoria Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-23INR0054, with a queue entry date of July 10, 2020. The proposed commercial operation date is March 15, 2026.

The project's interconnection agreement (IA) has been executed as of November 1, 2022. The point of interconnection (POI) is the 345kV Seabreeze Substation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Brazoria Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

345kV Seabreeze Substation

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.