Duffy Solar (ERCOT-23INR0057) — Project Summary

Queue ID
ERCOT-23INR0057
Capacity
502.46 MW
Technology
Solar
Status
active
Location
Matagorda, TX
Region
ERCOT
Developer
VDA Solar Texas 1 LLC
IA Status
IA Executed

Duffy Solar

ERCOT-23INR0057BetaActiveSolarERCOTLBNL + Live

502.46 MW generation in Matagorda, TX · In queue since September 2020 · Proposed COD December 2027

502.46 MW

Capacity

1

Components

Solar

5y 8m

In Queue

IA Executed

IA Status

Signed Apr 2023

Interconnection

Queue → IA

2y 7m

IA → COD

4y 8m

Total Duration

2y 7m

Construction75%
Queue EntrySep 11, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 12, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-31

About

Duffy Solar is a proposed 502.46 MW solar generation project located in Matagorda County, Texas. The developer is VDA Solar Texas 1 LLC. The project is interconnected within the Electric Reliability Council of Texas (ERCOT) queue as entry ERCOT-23INR0057, with a queue entry date of September 11, 2020. The proposed commercial operation date is December 31, 2027.

The project's Interconnection Agreement (IA) was executed on April 12, 2023. The point of interconnection is Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39). The Duffy Solar project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Matagorda

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

VDA Solar Texas 1 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.