Accalia Point Solar (ERCOT-23INR0066) — Project Summary

Queue ID
ERCOT-23INR0066
Capacity
190.5 MW
Technology
Solar
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
Accalia Point Solar LLC
IA Status
Facility Study

Accalia Point Solar

ERCOT-23INR0066BetaActiveSolarERCOTLBNL + Live

190.5 MW generation in Cameron, TX · In queue since October 2020 · Proposed COD May 2029

190.5 MW

Capacity

1

Components

Solar

5y 7m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

8y 7m

Facilities Study50%
Queue EntryOct 23, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-31

About

Accalia Point Solar is a proposed 190.5 MW solar generation project located in Cameron County, Texas. The project, developed by Accalia Point Solar LLC, is in the ERCOT interconnection queue as entry ERCOT-23INR0066, with a queue entry date of October 23, 2020. Its proposed commercial operation date is May 31, 2029, and its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Accalia Point Solar, LLC operating plant (EIA ID 66673). The point of interconnection is Tap 345kV 8383 North Edingburg _x0013_ 79501 Kingfisher.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Accalia Point Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 8383 North Edingburg _x0013_ 79501 Kingfisher

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
MESQUITE_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.