Cascade Solar (ERCOT-23INR0091) — Project Summary

Queue ID
ERCOT-23INR0091
Capacity
175 MW
Technology
Solar
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Cascade Solar Energy, LLC
IA Status
IA Executed

Cascade Solar

ERCOT-23INR0091BetaActiveSolarERCOTLBNL + Live

175 MW generation in Brazoria, TX · In queue since February 2021 · Proposed COD September 2026

175 MW

Capacity

1

Components

Solar

5y 3m

In Queue

IA Executed

IA Status

Signed Apr 2023

Interconnection

Queue → IA

2y 2m

IA → COD

3y 5m

Total Duration

2y 2m

Construction75%
Queue EntryFeb 9, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 17, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-09-01

About

Cascade Solar is a proposed 175 MW solar generation project located in Brazoria County, Texas. The project, developed by Cascade Solar Energy, LLC, is interconnected within the ERCOT region under queue ID ERCOT-23INR0091. It entered the interconnection queue on February 9, 2021, with a proposed commercial operation date of September 1, 2026.

The project's Interconnection Agreement (IA) has been executed as of April 17, 2023. The point of interconnection is the 345kV Oasis (43035) _x0013_ Seabreeze (43020) circuit 27.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Cascade Solar Energy, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

345kV Oasis (43035) _x0013_ Seabreeze (43020) circuit 27

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Cascade Solar