Cascade Solar
175 MW generation in Brazoria, TX · In queue since February 2021 · Proposed COD September 2026
175 MW
Capacity
1
Components
Solar
5y 3m
In Queue
IA Executed
IA Status
Signed Apr 2023
Queue → IA
2y 2m
IA → COD
3y 5m
Total Duration
2y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-09-01
Cascade Solar is a proposed 175 MW solar generation project located in Brazoria County, Texas. The project, developed by Cascade Solar Energy, LLC, is interconnected within the ERCOT region under queue ID ERCOT-23INR0091. It entered the interconnection queue on February 9, 2021, with a proposed commercial operation date of September 1, 2026.
The project's Interconnection Agreement (IA) has been executed as of April 17, 2023. The point of interconnection is the 345kV Oasis (43035) _x0013_ Seabreeze (43020) circuit 27.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Cascade Solar Energy, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345kV Oasis (43035) _x0013_ Seabreeze (43020) circuit 27
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Cascade Solar