Atria Solar
112.4 MW generation in Chambers, TX · In queue since October 2020 · Proposed COD December 2025
112.4 MW
Capacity
1
Components
Solar
5y 7m
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
5y 2m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-30
The Atria Solar project is a proposed 112.4 MW solar generation facility in Chambers County, Texas. The project, developed by Atria Energy Project, LLC, is located within the ERCOT region and interconnected to the 40770 Hacher 138kV point of interconnection. It entered the ERCOT interconnection queue as project ERCOT-23INR0101 on October 23, 2020, and has a proposed commercial operation date of December 30, 2025. The project's interconnection status is currently in the Facility Study phase.
The Atria Solar project has been featured in recent news coverage related to deals and industry developments.
Generated from interconnection queue and public data sources
State
TX
County
Chambers
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Atria Energy Project, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
40770 Hacher 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Atria Solar