BRP Kamet BESS
202.46 MW storage in Andrews, TX · In queue since October 2020 · Proposed COD December 2025
202.46 MW
Capacity
1
Components
Battery
5y 7m
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
5y 2m
Schedule
5 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-01
BRP Kamet BESS is a proposed 202.46 MW battery storage project located in Andrews County, Texas. The project, developed by BRP Kamet BESS LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0104, with a queue entry date of October 7, 2020. The proposed commercial operation date is December 1, 2025.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Andrews North _x0013_ McKenzie Draw Switch 138 kV. Recent news coverage has discussed the development project.
Generated from interconnection queue and public data sources
State
TX
County
Andrews
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP Kamet BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Andrews North _x0013_ McKenzie Draw Switch 138 kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about BRP Kamet BESS