BRP Pobeda BESS
301.41 MW storage in Grimes, TX · In queue since November 2020 · Proposed COD December 2024
301.41 MW
Capacity
1
Components
Battery
5y 6m
In Queue
Facility Study
IA Status
COD target: 2024
Total Duration
4y 1m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-01
The BRP Pobeda BESS project is a proposed 301.41 MW battery storage project located in Grimes County, Texas. Developed by BRP Pobeda BESS LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0115, with a queue entry date of November 18, 2020.
The proposed commercial operation date for the BRP Pobeda BESS project is December 1, 2024. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the 44645 Singleton 345kV location.
Generated from interconnection queue and public data sources
State
TX
County
Grimes
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP Pobeda BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
44645 Singleton 345kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- LMO_ESR_RN
- POI Substation
- Singleton Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.