Cantaloupe Solar (ERCOT-23INR0116) — Project Summary

Queue ID
ERCOT-23INR0116
Capacity
303.13 MW
Technology
Solar
Status
active
Location
Reeves, TX
Region
ERCOT
Developer
Saragosa Del Sol Energy, LLC
IA Status
IA Executed

Cantaloupe Solar

ERCOT-23INR0116BetaActiveSolarERCOTLBNL + Live

303.13 MW generation in Reeves, TX · In queue since December 2020 · Proposed COD July 2028

303.13 MW

Capacity

1

Components

Solar

5y 5m

In Queue

IA Executed

IA Status

Signed Apr 2024

Interconnection

Queue → IA

3y 4m

IA → COD

4y 3m

Total Duration

3y 4m

Construction75%
Queue EntryDec 22, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 23, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-07-01

About

Cantaloupe Solar is a proposed 303.13 MW solar generation project located in Reeves County, Texas. The project, developed by Saragosa Del Sol Energy, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0116, with a queue entry date of December 22, 2020. The proposed commercial operation date is July 1, 2028.

The interconnection agreement for Cantaloupe Solar was executed on April 23, 2024. The point of interconnection is the 60716 Saragosa 138kV substation. The project has been mentioned in recent industry news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Reeves

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Saragosa Del Sol Energy, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

60716 Saragosa 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Saragosa Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.