Blevins Solar (ERCOT-23INR0118) — Project Summary

Queue ID
ERCOT-23INR0118
Capacity
271.58 MW
Technology
Solar
Status
active
Location
Falls, TX
Region
ERCOT
Developer
Blevins Solar, LLC
IA Status
IA Executed

Blevins Solar

ERCOT-23INR0118BetaActiveSolarERCOTLBNL + Live

271.58 MW generation in Falls, TX · In queue since February 2021 · Proposed COD March 2026

271.58 MW

Capacity

1

Components

Solar

5y 3m

In Queue

IA Executed

IA Status

Signed Jun 2023

Interconnection

Queue → IA

2y 4m

IA → COD

2y 9m

Total Duration

2y 4m

Schedule

2 months past proposed COD

Construction75%
Queue EntryFeb 4, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 17, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-03-06

About

Blevins Solar is a proposed solar generation project located in Falls County, Texas, within the ERCOT region. The project, developed by Blevins Solar, LLC, has a total capacity of 271.58 MW. It consists entirely of solar photovoltaic generation.

The project entered the ERCOT interconnection queue as entry 23INR0118 on February 4, 2021, with a proposed commercial operation date of March 6, 2026. An Interconnection Agreement (IA) was executed on June 17, 2023. The project has been the subject of recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Falls

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Blevins Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap Bellfalls Switch (3404) _x0013_ Lake Creek Switch (3409)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Blevins Solar