BRP Sepik BESS
200.85 MW storage in Mitchell, TX · In queue since December 2020 · Proposed COD March 2028
200.85 MW
Capacity
1
Components
Battery
5y 5m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
7y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-01
The BRP Sepik BESS project is a proposed 200.85 MW battery storage project located in Mitchell County, Texas. The developer is BRP Sepik BESS LLC. It is interconnected within the ERCOT region under queue ID ERCOT-23INR0143, with an interconnection queue entry date of December 22, 2020. The proposed commercial operation date is March 1, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The project consists solely of battery storage, with a total capacity of 200.85 MW. The point of interconnection is at a tap on the 138kV line between Loraine South (11342) and Ranger Camp (10050). The project is currently listed as active within the ERCOT interconnection queue.
Generated from interconnection queue and public data sources
State
TX
County
Mitchell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP Sepik BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 138kV 11342 Loraine South _x0013_ 10050 Ranger Camp
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about BRP Sepik BESS