Umbra (Stockyard) Solar (ERCOT-23INR0155) — Project Summary

Queue ID
ERCOT-23INR0155
Capacity
207.84 MW
Technology
Solar
Status
suspended
Location
Franklin, TX
Region
ERCOT
Developer
IA Status

Umbra (Stockyard) Solar

ERCOT-23INR0155BetaSuspendedSolarERCOTLBNL

207.84 MW generation in Franklin, TX · In queue since January 2021

207.84 MW

Capacity

1

Components

Solar

5y 4m

In Queue

IA Status

Interconnection

Total Duration

5y 4m

Suspended0%
Queue EntryJan 25, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

The proposed Umbra (Stockyard) Solar project is a 207.84 MW solar generation facility located in Franklin County, Texas. The project is listed in the ERCOT interconnection queue as entry ERCOT-23INR0155, with an initial queue entry date of January 25, 2021.

As of the latest data, the project's interconnection status is listed as suspended. No proposed commercial operation date or interconnection agreement (IA) status is available. The developer is not specified in the available data.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Franklin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Utility

Entity

ERCOT

Service Type

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Umbra (Stockyard) Solar