Jackalope Solar (ERCOT-23INR0180) — Project Summary

Queue ID
ERCOT-23INR0180
Capacity
155.68 MW
Technology
Solar
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
Peacock Energy Project, LLC
IA Status
IA Executed

Jackalope Solar

ERCOT-23INR0180BetaActiveSolarERCOTLBNL + Live

155.68 MW generation in San Patricio, TX · In queue since February 2021 · Proposed COD February 2026

155.68 MW

Capacity

1

Components

Solar

5y 3m

In Queue

IA Executed

IA Status

Signed Sep 2021

Interconnection

Queue → IA

7 months

IA → COD

4y 5m

Total Duration

7 months

Schedule

3 months past proposed COD

Construction75%
Queue EntryFeb 9, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 30, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-02-05

About

Jackalope Solar is a proposed 155.68 MW solar generation project located in San Patricio County, Texas. The project, developed by Peacock Energy Project, LLC, is interconnected within the ERCOT region under queue ID ERCOT-23INR0180. It consists of 155.68 MW of solar photovoltaic generation.

The project entered the ERCOT interconnection queue on February 9, 2021, with a proposed commercial operation date of February 5, 2026. An Interconnection Agreement (IA) was executed on September 30, 2021, and the project's interconnection point of contact is the 8173 Gibbs 138kV substation. The project currently has an active status in the queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Peacock Energy Project, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

8173 Gibbs 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Jackalope Solar