Leitrim 1 Solar (ERCOT-23INR0187) — Project Summary

Queue ID
ERCOT-23INR0187
Capacity
98.44 MW
Technology
Solar
Status
active
Location
Hill, TX
Region
ERCOT
Developer
Leitsol LLC
IA Status
Facility Study

Leitrim 1 Solar

ERCOT-23INR0187BetaActiveSolarERCOTLBNL + Live

98.44 MW generation in Hill, TX · In queue since January 2021 · Proposed COD April 2027

98.44 MW

Capacity

1

Components

Solar

5y 4m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

6y 3m

Facilities Study50%
Queue EntryJan 26, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-26

About

Leitrim 1 Solar is a proposed solar generation project located in Hill County, Texas, with a total capacity of 98.44 MW. The project, developed by Leitsol LLC, is currently in the ERCOT interconnection queue as entry ERCOT-23INR0187, with a queue entry date of January 26, 2021. Its proposed commercial operation date is April 26, 2027, and its interconnection agreement status is currently in the Facility Study phase.

The proposed project is linked to the existing Leitrim Solar Park operating plant (EIA plant ID 67544).

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hill

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Leitsol LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 138kV 3522 Hillsboro - 3546 Whitney

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
HIGH
Nearest Node (Estimated)
WND_WHITNEY
POI Substation
Rogers Hill Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Leitrim 1 Solar