Leitrim 1 Solar
98.44 MW generation in Hill, TX · In queue since January 2021 · Proposed COD April 2027
98.44 MW
Capacity
1
Components
Solar
5y 4m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
6y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-04-26
Leitrim 1 Solar is a proposed solar generation project located in Hill County, Texas, with a total capacity of 98.44 MW. The project, developed by Leitsol LLC, is currently in the ERCOT interconnection queue as entry ERCOT-23INR0187, with a queue entry date of January 26, 2021. Its proposed commercial operation date is April 26, 2027, and its interconnection agreement status is currently in the Facility Study phase.
The proposed project is linked to the existing Leitrim Solar Park operating plant (EIA plant ID 67544).
Generated from interconnection queue and public data sources
State
TX
County
Hill
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Leitsol LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 138kV 3522 Hillsboro - 3546 Whitney
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WND_WHITNEY
- POI Substation
- Rogers Hill Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.