Snap Jaw BESS
201.28 MW generation in Harris, TX · In queue since April 2021 · Proposed COD June 2028
201.28 MW
Capacity
1
Components
Other
5y 1m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
7y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-01
The proposed Snap Jaw BESS project is a 201.28 MW energy storage development by Moccasin Pointe Grid, LLC, located in Harris County, Texas. The project consists of 201.28 MW of "Other" technology, which in ERCOT is typically a Battery Energy Storage System (BESS). It is listed in the ERCOT interconnection queue as entry ERCOT-23INR0217, with a queue entry date of April 5, 2021, and a proposed commercial operation date of June 1, 2028. The project's interconnection agreement status is currently in the Facility Study phase.
The Snap Jaw BESS project is proposed to interconnect at the tap 138kV 40941 La Porte - 40200 Bimont (Air Liquide) point of interconnection. The project's status is currently listed as "suspended" within the ERCOT queue. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Harris
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Moccasin Pointe Grid, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 138kV 40941 La Porte - 40200 Bimont (Air Liquide)
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- SJS_SJS_G1
- POI Substation
- La Porte Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.