HOPSLAM BESS (ERCOT-23INR0220) — Project Summary

Queue ID
ERCOT-23INR0220
Capacity
151.11 MW
Technology
Battery
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
Momentum LRC Holdco LLC
IA Status
Facility Study

HOPSLAM BESS

ERCOT-23INR0220BetaActiveBatteryERCOTLBNL

151.11 MW storage in Pecos, TX · In queue since March 2021 · Proposed COD September 2025

151.11 MW

Capacity

1

Components

Battery

5y 2m

In Queue

Facility Study

IA Status

COD target: 2025

Interconnection

Total Duration

4y 6m

Schedule

8 months past proposed COD

Facilities Study50%
Queue EntryMar 16, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-09-20

About

The HOPSLAM BESS project is a proposed 151.11 MW battery storage project located in Pecos County, Texas. Developed by Momentum LRC Holdco LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0220, with a queue entry date of March 16, 2021. The proposed commercial operation date is September 20, 2025.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 38430 White Baker TNP 138kV location. The HOPSLAM BESS project has also appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Momentum LRC Holdco LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

38430 White Baker TNP 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
PAVO_ESS_ALL
POI Substation
White Baker Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about HOPSLAM BESS