MRG GOODY SOLAR
171.72 MW generation in Lamar, TX · In queue since March 2021 · Proposed COD March 2026
171.72 MW
Capacity
1
Components
Solar
5y 2m
In Queue
IA Executed
IA Status
Signed Nov 2023
Queue → IA
2y 8m
IA → COD
2y 4m
Total Duration
2y 8m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-03-20
The MRG GOODY SOLAR project is a proposed solar generation facility with a total capacity of 171.72 MW. Located in Lamar County, Texas, the project is being developed by MRG GOODY SOLAR PROJECT, LLC. It is interconnected within the ERCOT region under queue ID ERCOT-23INR0225, with an interconnection queue entry date of March 16, 2021. The proposed commercial operation date is March 20, 2026, and the Interconnection Agreement (IA) was executed on November 7, 2023.
The project is linked to the existing operating plant named MRG Goody Solar Project Hybrid (EIA plant ID 66390). The project has also been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Lamar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
MRG GOODY SOLAR PROJECT, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV Toco Switch (#1700) _x0013_ Paris Switch (#1693)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- TOCO_8
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14