Hiru Solar
614.4 MW generation in Clay, TX · In queue since April 2021 · Proposed COD April 2029
614.4 MW
Capacity
1
Components
Solar
5y 1m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
8 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-04-01
The Hiru Solar project is a proposed 614.4 MW solar generation facility in Clay County, Texas. The project, developed by Hecate Energy Hazel LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0228, with a queue entry date of April 21, 2021. Its proposed commercial operation date is April 1, 2029. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection for Hiru Solar is the Tap 345kV 6111 Riley - 1730 West Krum ckt 1. The project has appeared in recent news coverage regarding solar development in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Clay
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hecate Energy Hazel LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 6111 Riley - 1730 West Krum ckt 1
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ELECTRAW_1_2
- POI Substation
- Riley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.