Earthwise Solar
370.5 MW generation in Hardeman, TX · In queue since March 2022 · Proposed COD December 2028
370.5 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
6y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
Earthwise Solar is a proposed 370.5 MW solar generation project located in Hardeman County, Texas. The project, developed by Quanah Solar 2, is in the ERCOT interconnection queue as entry ERCOT-23INR0233, with a queue entry date of March 14, 2022. The proposed commercial operation date is December 31, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV 60504 Tesla - 61001 Jim Treece. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Hardeman
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Quanah Solar 2
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 60504 Tesla - 61001 Jim Treece
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- MISAE_GEN_RN
- POI Substation
- Tesla Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.