Flatland Solar Project
182.2 MW generation in Scurry, TX · In queue since May 2021 · Proposed COD December 2025
182.2 MW
Capacity
1
Components
Solar
5 years
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
4y 7m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
The Flatland Solar Project is a proposed 182.2 MW solar generation project located in Scurry County, Texas. Developed by Flatland Solar Project, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0260, with a queue entry date of May 10, 2021. The proposed commercial operation date is December 31, 2025, and the project's interconnection agreement status is currently in the Facility Study phase.
The Flatland Solar Project has been featured in recent news coverage. The point of interconnection is the 11319 Scurry County 138kV line.
Generated from interconnection queue and public data sources
State
TX
County
Scurry
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Flatland Solar Project, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
11319 Scurry County 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Scurry County South Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.