Flatland Solar Project (ERCOT-23INR0260) — Project Summary

Queue ID
ERCOT-23INR0260
Capacity
182.2 MW
Technology
Solar
Status
active
Location
Scurry, TX
Region
ERCOT
Developer
Flatland Solar Project, LLC
IA Status
Facility Study

Flatland Solar Project

ERCOT-23INR0260BetaActiveSolarERCOTLBNL

182.2 MW generation in Scurry, TX · In queue since May 2021 · Proposed COD December 2025

182.2 MW

Capacity

1

Components

Solar

5 years

In Queue

Facility Study

IA Status

COD target: 2025

Interconnection

Total Duration

4y 7m

Schedule

4 months past proposed COD

Facilities Study50%
Queue EntryMay 10, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

About

The Flatland Solar Project is a proposed 182.2 MW solar generation project located in Scurry County, Texas. Developed by Flatland Solar Project, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0260, with a queue entry date of May 10, 2021. The proposed commercial operation date is December 31, 2025, and the project's interconnection agreement status is currently in the Facility Study phase.

The Flatland Solar Project has been featured in recent news coverage. The point of interconnection is the 11319 Scurry County 138kV line.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Scurry

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Flatland Solar Project, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

11319 Scurry County 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Scurry County South Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Flatland Solar Project