Sultan Solar (ERCOT-23INR0295) — Project Summary

Queue ID
ERCOT-23INR0295
Capacity
206.11 MW
Technology
Solar
Status
active
Location
Bosque, TX
Region
ERCOT
Developer
Lake Whitney Solar, LLC
IA Status
Facility Study

Sultan Solar

ERCOT-23INR0295BetaActiveSolarERCOTLBNL

206.11 MW generation in Bosque, TX · In queue since July 2021 · Proposed COD December 2026

206.11 MW

Capacity

1

Components

Solar

4y 10m

In Queue

Facility Study

IA Status

COD target: 2026

Interconnection

Total Duration

5y 5m

Facilities Study50%
Queue EntryJul 1, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

About

Sultan Solar is a proposed solar generation project located in Bosque County, Texas, with a total capacity of 206.11 MW. The project, developed by Lake Whitney Solar, LLC, is in the ERCOT interconnection queue as entry ERCOT-23INR0295, with a queue entry date of July 1, 2021. The proposed commercial operation date is December 31, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 206.11 MW of solar photovoltaic generation. The point of interconnection is at the tap 345kV 68080 Sam Switch _x0013_ 68090 Kopperl. Sultan Solar has been mentioned in recent news coverage related to the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bosque

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lake Whitney Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 345kV 68080 Sam Switch _x0013_ 68090 Kopperl

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.