Liberty Senate Energy Storage 1 (ERCOT-23INR0334) — Project Summary

Queue ID
ERCOT-23INR0334
Capacity
207.4 MW
Technology
Battery
Status
active
Location
Jack, TX
Region
ERCOT
Developer
Senate Solar LLC
IA Status
Facility Study

Liberty Senate Energy Storage 1

ERCOT-23INR0334BetaActiveBatteryERCOTLBNL + Live

207.4 MW storage in Jack, TX · In queue since October 2021 · Proposed COD October 2027

207.4 MW

Capacity

1

Components

Battery

4y 7m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

6 years

Facilities Study50%
Queue EntryOct 5, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-27

About

Liberty Senate Energy Storage 1 is a proposed 207.4 MW battery storage project located in Jack County, Texas. The project, developed by Senate Solar LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0334, with a queue entry date of October 5, 2021. The proposed commercial operation date is October 27, 2027. The project's interconnection status is currently in the Facility Study phase, and its point of interconnection is the 1445 Burwick 345kV substation.

The development project consists solely of battery storage, with a total capacity of 207.4 MW. Recent news coverage has discussed the project's progress within the ERCOT interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Jack

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Senate Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1445 Burwick 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.