Brizo BESS
140.76 MW storage in Victoria, TX · In queue since October 2021 · Proposed COD December 2027
140.76 MW
Capacity
1
Components
Battery
4y 7m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
Brizo BESS is a proposed 140.76 MW battery storage project located in Victoria County, Texas. The project, developed by BRP Brizo BESS LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0342, with a queue entry date of October 5, 2021. The proposed commercial operation date is December 1, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 138 kV Loop 463 Substation (#5680). The development has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Victoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP Brizo BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 kV Loop 463 Substation (#5680)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- BRP_LOOP_RN
- POI Substation
- Loop 463 Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Brizo BESS