Elmax Power Station (TEF- Due Diligence) (ERCOT-23INR0345) — Project Summary

Queue ID
ERCOT-23INR0345
Capacity
518.83 MW
Technology
Gas
Status
active
Location
Harris, TX
Region
ERCOT
Developer
Elmax Generating, LLC
IA Status
Facility Study

Elmax Power Station (TEF- Due Diligence)

ERCOT-23INR0345BetaActiveGasERCOTLBNL + Live

518.83 MW generation in Harris, TX · In queue since September 2021 · Proposed COD July 2028

518.83 MW

Capacity

1

Components

Gas

4y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

6y 10m

Facilities Study50%
Queue EntrySep 14, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-05

About

The Elmax Power Station (TEF- Due Diligence) is a proposed project in Harris County, Texas, being developed by Elmax Generating, LLC. This gas-fired generation project has a total capacity of 518.83 MW. The project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0345, with a queue entry date of September 14, 2021.

The proposed commercial operation date for the Elmax Power Station is July 5, 2028. Its interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138 kV Lake Houston (#40820) - Atascocita (#40130) ckt 66.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Elmax Generating, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 kV Lake Houston (#40820) - Atascocita (#40130) ckt 66

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.