Blue Valley Solar (ERCOT-23INR0352) — Project Summary

Queue ID
ERCOT-23INR0352
Capacity
147.99 MW
Technology
Solar
Status
active
Location
Val Verde, TX
Region
ERCOT
Developer
Blue Valley Solar, LLC
IA Status
Facility Study

Blue Valley Solar

ERCOT-23INR0352BetaActiveSolarERCOTLBNL

147.99 MW generation in Val Verde, TX · In queue since November 2021 · Proposed COD March 2028

147.99 MW

Capacity

1

Components

Solar

4y 6m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

6y 4m

Facilities Study50%
Queue EntryNov 16, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-15

About

Blue Valley Solar is a proposed solar generation project located in Val Verde County, Texas, with a total capacity of 147.99 MW. Developed by Blue Valley Solar, LLC, the project consists entirely of solar photovoltaic generation. It is currently in the ERCOT interconnection queue as entry ERCOT-23INR0352, with a queue entry date of November 16, 2021, and a proposed commercial operation date of March 15, 2028. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection is planned at a tap on the 138 kV Comstock(#8683) - Corral Line(#60389). The Blue Valley Solar project has been mentioned in recent news coverage related to the electric grid and the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Val Verde

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Blue Valley Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap on the 138 kV Comstock(#8683) - Corral Line(#60389)

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Blue Valley Solar