Tidwell Prairie IV Energy Storage (ERCOT-23INR0421) — Project Summary

Queue ID
ERCOT-23INR0421
Capacity
202.88 MW
Technology
Battery
Status
active
Location
Robertson, TX
Region
ERCOT
Developer
Tidwell Prairie LLC
IA Status
Facility Study

Tidwell Prairie IV Energy Storage

ERCOT-23INR0421BetaActiveBatteryERCOTLBNL + Live

202.88 MW storage in Robertson, TX · In queue since November 2021 · Proposed COD June 2027

202.88 MW

Capacity

1

Components

Battery

4y 6m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntryNov 15, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-01

About

Tidwell Prairie IV Energy Storage is a proposed 202.88 MW battery storage project in Robertson County, Texas. Developed by Tidwell Prairie LLC, the project is located within the ERCOT region and entered the interconnection queue as ERCOT-23INR0421 on November 15, 2021. The proposed commercial operation date is June 1, 2027, and its interconnection status is currently in the Facility Study phase.

The project is linked to the existing Tidwell Prairie Storage 1 operating plant (EIA ID: 66337). The point of interconnection is Tap TNP ONE 39950 and Twin Oak 3400. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Robertson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tidwell Prairie LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap TNP ONE 39950 and Twin Oak 3400

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
HIGH
Nearest Node (Estimated)
TDWLPR_1_RN
POI Substation
Phillips Coal Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Tidwell Prairie IV Energy Storage