BRP Pollux BESS (ERCOT-23INR0431) — Project Summary

Queue ID
ERCOT-23INR0431
Capacity
163.42 MW
Technology
Battery
Status
active
Location
Bosque, TX
Region
ERCOT
Developer
BRP Pollux BESS LLC
IA Status
Facility Study

BRP Pollux BESS

ERCOT-23INR0431BetaActiveBatteryERCOTLBNL + Live

163.42 MW storage in Bosque, TX · In queue since January 2022 · Proposed COD December 2029

163.42 MW

Capacity

1

Components

Battery

4y 4m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

7y 11m

Facilities Study50%
Queue EntryJan 6, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

About

The BRP Pollux BESS project is a proposed 163.42 MW battery storage project located in Bosque County, Texas. Developed by BRP Pollux BESS LLC, the project is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-23INR0431 on January 6, 2022. The current interconnection status is Facility Study, with a proposed commercial operation date of December 1, 2029.

The project consists entirely of battery storage, with a total capacity of 163.42 MW. The point of interconnection is the 138 kV Olsen Switching Station (#37460). The project is currently listed as active within the ERCOT interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bosque

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Pollux BESS LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

138 kV Olsen Switching Station (#37460)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Ajo Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about BRP Pollux BESS