Rio Nogales CT1 Rotor Replacement (ERCOT-23INR0483) — Project Summary

Queue ID
ERCOT-23INR0483
Capacity
3.1 MW
Technology
Gas
Status
active
Location
Guadalupe, TX
Region
ERCOT
Developer
CPS Energy
IA Status
IA Executed

Rio Nogales CT1 Rotor Replacement

ERCOT-23INR0483BetaActiveGasERCOTLBNL

3.1 MW generation in Guadalupe, TX · Proposed COD June 2023

3.1 MW

Capacity

1

Components

Gas

In Queue

IA Executed

IA Status

Signed Jan 2023

Interconnection

IA → COD

5 months

Schedule

35 months past proposed COD

Construction75%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 20, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2023-06-08

About

The Rio Nogales CT1 Rotor Replacement project is a proposed 3.1 MW gas-fired generation project located in Guadalupe County, Texas. The project, developed by CPS Energy, is interconnected within the ERCOT region under queue ID ERCOT-23INR0483. The proposed commercial operation date (COD) is June 8, 2023.

The project has an Interconnection Agreement (IA) executed on January 20, 2023, and is currently listed as active in the ERCOT interconnection queue. The point of interconnection (POI) is the Rio Nogales Substation 5362 RIONOG 345kV.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Guadalupe

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CPS Energy

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Rio Nogales Substation 5362 RIONOG 345kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CDRVLE_U1_RN
POI Substation
Del Rio Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Rio Nogales CT1 Rotor Replacement