Wildhorse POD Solar
9.99 MW generation in Howard, TX · In queue since October 2023
9.99 MW
Capacity
1
Components
Solar
2y 7m
In Queue
In Progress (unknown study)
IA Status
Total Duration
2y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Wildhorse POD Solar is a proposed 9.99 MW solar generation project located in Howard County, Texas. The project, developed by Highpeak Solar, LLC, is interconnected within the Electric Reliability Council of Texas (ERCOT) region.
The project entered the ERCOT interconnection queue as entry ERCOT-23INR0537 on October 2, 2023. Its interconnection agreement status is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
TX
County
Howard
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Highpeak Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
TDSP Station Code: WHPOD_x000D_ PTI BUS #: 1397_x000D_ Load/Load TR: LDWHPOD_x000D_ Voltage Level (Transmission): 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Wildhorse POD Solar