Cascabel Wind 2 (ERCOT-23INR0561) — Project Summary

Queue ID
ERCOT-23INR0561
Capacity
197.75 MW
Technology
Wind
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
Vaquero Wind Energy, LLC
IA Status
Facility Study

Cascabel Wind 2

ERCOT-23INR0561BetaActiveWindERCOTLBNL + Live

197.75 MW generation in Zapata, TX · In queue since March 2023 · Proposed COD December 2027

197.75 MW

Capacity

1

Components

Wind

3y 2m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 9m

Facilities Study50%
Queue EntryMar 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

The Cascabel Wind 2 project is a proposed wind generation facility with a total capacity of 197.75 MW. The project, developed by Vaquero Wind Energy, LLC, is located in Zapata County, Texas, and interconnects within the ERCOT region. It entered the ERCOT interconnection queue as entry ERCOT-23INR0561 on March 13, 2023, and has a proposed commercial operation date of December 1, 2027. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection (POI) for Cascabel Wind 2 is the 345 kV Rapido Substation, a new ERCOT Transmission (ETT) substation tapping the existing 345 kV line from CENIZO7C (#80225) to DELSOL7C (#80307). The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Vaquero Wind Energy, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307).

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Substation 41

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Cascabel Wind 2