Farmersville West BESS 2
9.9 MW storage in Collin, TX · In queue since June 2023 · Proposed COD November 2024
9.9 MW
Capacity
1
Components
Battery
2y 11m
In Queue
IA Executed
IA Status
Signed Apr 2024
Queue → IA
10 months
IA → COD
7 months
Total Duration
10 months
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2024-11-30
The Farmersville West BESS 2 project is a proposed 9.9 MW battery storage project located in Collin County, Texas. The developer is SBESS TX 7 LLC. This project is interconnected within the ERCOT region under queue ID ERCOT-23INR0618, with a queue entry date of June 14, 2023, and a proposed commercial operation date of November 30, 2024.
The project's Interconnection Agreement (IA) has been executed as of April 5, 2024. The project is linked to the existing Farmersville West operating plant (EIA plant ID 67843).
Generated from interconnection queue and public data sources
State
TX
County
Collin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
SBESS TX 7 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Station Name: Farmersville West TNP Substation Station Code: FRMRSVLW PTI Bus#: 37291 Load Transformer Name: FRMVW_3 Transmission Level Voltage: 138 kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- HIGH
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Farmersville West BESS 2