Junction North BESS
9.9 MW storage in Kimble, TX · In queue since June 2023 · Proposed COD November 2024
9.9 MW
Capacity
1
Components
Battery
2y 11m
In Queue
IA Executed
IA Status
Signed Sep 2023
Queue → IA
3 months
IA → COD
1y 2m
Total Duration
3 months
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2024-11-30
The Junction North BESS project is a proposed 9.9 MW battery storage project located in Kimble County, Texas. The developer is SBESS TX 5 LLC. This project is interconnected within the ERCOT queue as entry ERCOT-23INR0619, with a queue entry date of June 14, 2023, and a proposed commercial operation date of November 30, 2024. The Interconnection Agreement (IA) for the project has been executed as of September 5, 2023.
The Junction North BESS project is linked to the existing Junction BESS operating plant (EIA plant ID 67845).
Generated from interconnection queue and public data sources
State
TX
County
Kimble
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
SBESS TX 5 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Station Name: New Junction Station Code: P_NEWJUNC_1_ PTI Bus#: 70600 Load XFMR Name: PEC Load ID: 1 << The planning cases do not have "Load Names" only a two character Load ID Transmission Level Voltage: 69 kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- JUNORTH_RN
- POI Substation
- Junction Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Junction North BESS